Introduction
Purpose of this Document
This document describes the MineTwin tool for planning and simulating mining operations. It serves as a reference for MineTwin users seeking to understand the tool’s capabilities and workflow.
System Overview
MineTwin OpenPit enables users to schedule and simulate open-pit mining operations. It is composed of the following modules:
-
Editor
-
The Editor allows creating and editing scenarios via the MineTwin OpenPit UI or Excel files.
-
-
Integration module
-
The Integration Module enables importing data on the road network, block locations and properties, and equipment maintenance from external systems. Supported formats include .xlsx, .txt, .dxf, .str, .obj, and .dtm.
-
-
Scheduler
-
In MineTwin’s scheduling mode, each shift is planned and then simulated one at a time. After completing a shift, the Scheduler plans the next one based on simulation results from the previous shift.
-
-
Simulation model
Operations follow two sequential stages:
-
Equipment scheduling by the Scheduler.
-
Simulation of equipment and transportation based on that schedule.
-