News

  • 2026-06-05 Battery-powered equipment
  • 2026-05-22 Drawing arcs and polylines using continuous method
  • 2026-05-21 Added layout (background lines and text labels)
  • 2026-05-10 Additional Graph Processing Tools
  • 2026-05-08 Improved logic for vehicle overtaking and passing
  • 2026-04-27 Creating scenarios by importing data from an Excel file
  • 2026-04-24 Unloading multiple hoists into one surface storage
  • 2026-04-23 "Layering" of ore of different qualities in ore storage locations (ore passes, CDPs, storages, and dump areas)
  • 2026-04-22 A new type of equipment – shotcrete machines
  • 2026-03-26 Acceptable range of ore quality in ore pass
  • 2026-03-25 Unavailability periods of dump areas
  • 2026-03-18 Properties of ore passes, cross-dock points (CDP) and dump areas
  • 2026-03-11 Output bunker capacity of the conveyor and the fill level threshold for resuming operation.
  • 2026-02-17 Transportation of mined mass between dumps and ore stockpiles (Dump Area)
  • 2026-02-14 Displaying the calculation of availability, utilization, and effective utilization for each equipment unit
  • 2026-02-13 Сonveyor custom length
  • 2026-02-03 MineTwin now supports Spanish
  • 2025-12-12 Dynamic dispatching
  • 2025-12-03 Consideration of the fragmentation rate
  • 2025-11-07 Calculation of mobile equipment speed
  • 2025-11-06 Dependencies and priorities in work planning
  • 2025-10-27 Explosive work in the mine area and the unavailability of equipment
  • 2025-10-07 Calculation of drilling depth and setup time